TA SYSTEM

Instrumentation

Pressure, temperature and level instruments for monitoring industrial processes and feeding measurements to control systems.

Request a quotation

Choose instrumentation for your application

When adding a measurement point or replacing an instrument, start with the measurement objective, process conditions and installation constraints.

Example of a measurement instrument installed on industrial piping
  • Measure flow without cutting into existing pipes

    Clamp-on Ultrasonic Flow Meter

    Sensors mount on the outside of the pipe. Check pipe material, dimensions and fluid type before selecting a meter.

  • Monitor tank level

    Non-contact Radar Level Transmitter

    Measure level without bringing the sensor into contact with the liquid. Check mounting position and obstructions inside the tank.

  • Detect filter buildup

    Differential Pressure Transmitter

    Monitor the pressure difference across a filter to help decide when to inspect or replace it.

  • Monitor process temperature

    Temperature Transmitter

    Send sensor readings to the control system. Select for the required range, response time and compatibility with existing equipment.

Share the measurement variable, range, installation point and existing model, if known, so the engineering team can discuss your application.

Discuss your measurement application

Explore Emerson measurement technology

Technical information to provide

  • Measurement range and required accuracy
  • Response time and signal type
  • Process connection and wetted materials
  • Site conditions and documentation requirements

Industrial applications

  • Measure pump discharge pressure
  • Monitor production-line temperature
  • Track buffer tank levels

Selection guidelines

Define the variable and installation point, then choose the measurement principle. Check calibration access and compatibility with the existing I/O or control system.

Frequently asked questions

How should I specify accuracy?

State the allowable measurement error, units and operating range so proposals can be compared on the same basis.

What should I check when replacing a transmitter?

Check its range, connection, power supply, signal, control-system settings and installation-area requirements.