Industrial Automation
Machine and process control design that integrates PLC, HMI and SCADA with plant equipment and field instruments.
Request a quotationTechnical information to provide
- I/O types and counts
- Sequences, interlocks and response requirements
- Networks and system interfaces
- FAT, SAT and shutdown window requirements
Industrial applications
- Automate production sequences
- Consolidate utility alarms
- Upgrade control panels and operator screens
Selection guidelines
Prepare the I/O list and control narrative before defining the architecture. Check existing interfaces and align the cutover plan with available production downtime.
Frequently asked questions
Can the project be phased?
Yes, when scope, temporary interfaces and rollback criteria are agreed for each phase.
What should FAT and SAT cover?
Base the tests on agreed sequences, alarms, interlocks and abnormal operating scenarios.
